National Day Parade 2026 Road Traffic Advisory for Combined Rehearsal 2 (CR2) on 4 Jul 2026

Featured image
STARTS TOMORROW
Starts4 Jul 2026 (Sat) (ONE day only)
Location Not Specified
We are now on Telegram. Click to join

NDP 2026 Combined Rehearsal 2 road traffic advisory for 4 Jul 2026

Motorists, commuters and visitors heading to the Kallang and National Stadium precinct should take note of road and lane closures for National Day Parade 2026 Combined Rehearsal 2 (CR2) on Saturday, 4 July 2026. 🚧

The closures support event operations and help keep members of the public, participants and road users safe around the stadium area. Expect heavier traffic around Stadium Drive, Stadium Boulevard, Stadium Walk, Stadium Crescent, Nicoll Highway, Mountbatten Road, Guillemard Road, Jalan Benaan Kapal and nearby access roads during the affected periods.

For smoother travel, plan routes earlier, allow extra buffer time and check live traffic conditions using Google Maps, Apple Maps or Waze before entering the area. Visitors heading to the Singapore Sports Hub may also wish to consider rail access via Stadium MRT station where suitable. πŸš† For venue access, check the official NDP 2026 directions page for walking directions from Stadium MRT, Kallang MRT and Tanjong Rhu MRT, plus affected bus stops and taxi stands.

Road and lane closure details

Road ClosureTime
1. Stadium Drive (between the roundabout connecting Stadium Drive and the exit into Nicoll Highway, and the roundabout connecting Stadium Drive, Stadium Boulevard and Stadium Walk)

2. The slip road leading from Stadium Drive into Stadium Boulevard

3. The slip road leading from Stadium Boulevard into Stadium Drive

4. The loop of Stadium Boulevard (between lamp post 10F and lamp post 13F)

5. The loop of Jalan Benaan Kapal (between Stadium Crescent and lamp post 36)

From 7 a.m. to 11 p.m.
6. Left lane of Kallang Airport Way in the direction of Stadium Road (between Sims Way and lamp post 13)From 5 p.m. to 8 p.m.
7. Stadium Crescent (between lamp post 22 and lamp post 24)

8. Stadium Walk (between lamp post 1 and lamp post 4)

9. Stadium Walk (between lamp post 5 and lamp post 20)

10. 2 right lanes of Stadium Way in the direction of Stadium Walk (between lamp post 24 and Stadium Walk)

11. The slip road leading from Stadium Crescent into Stadium Walk

From 5 p.m. to 11 p.m.
12. The carriageway of Nicoll Highway in the direction of Guillemard Road (between lamp post 29/1F and Mountbatten Road)

13. The carriageway of Nicoll Highway in the direction of Esplanade Drive (between Mountbatten Road and lamp post 17/1F)

14. 3 left lanes of Guillemard Road in the direction of Nicoll Highway (between lamp post 8 and Mountbatten Road)

15. The slip road leading from Mountbatten Road into Nicoll Highway

16. Left lane of Stadium Drive in the direction of Stadium Walk (between the roundabout connecting Stadium Road, Stadium Place and the exit into Nicoll Highway, and the roundabout connecting Stadium Drive and the exit into Nicoll Highway)

17. Right lane of Stadium Drive in the direction of Stadium Road (between the roundabout connecting Stadium Drive and the exit into Nicoll Highway and the roundabout connecting Stadium Road, Stadium Drive, Stadium Place and the exit into Nicoll Highway)

18. The slip road leading from the roundabout connecting Stadium Drive and the exit into Nicoll Highway

From 7 p.m. to 10 p.m.
19. Jalan Benaan Kapal opposite Decathlon carpark exit

20. Jalan Benaan Kapal (between Stadium Way and Mountbatten Road)

From 9 p.m. to 11.59 p.m

Quick travel notes

  • πŸš— Avoid driving into the stadium precinct during closure windows unless necessary.
  • 🚌 SBS Transit Services 10, 14, 16, 70/70M and 196 will skip selected stops along Nicoll Highway on 4 July 2026 from 7 p.m. to 10 p.m.
  • 🚌 SBS Transit Service 11 will skip selected stops around Stadium Boulevard, Stadium Crescent and Stadium Walk on 4 July 2026 from 5 p.m. to 11 p.m.
  • πŸ“„ Refer to the SBS Transit temporary route diversion poster (PDF) for affected bus stops and service details.
  • πŸš† Take the MRT where suitable, especially when heading to the affected Kallang and Stadium areas.
  • πŸ“ Check navigation apps close to departure time, as road conditions may change during event operations.
  • πŸ‘Ÿ For visitors already in the area, follow on-ground signage and instructions from traffic marshals or officers.

Also note for aerial activities: Temporary Restricted Areas will be in effect on 4 July 2026 from 5 p.m. to 7.30 p.m. and 7.30 p.m. to 9 p.m. for NDP-related aerial activities. Unauthorised drone flying, kite-flying, captive balloons and the release of free-flight aerial objects are not allowed within the restricted areas during the affected periods. 🚫

For official updates, visit the NDP 2026 advisories page, view the Road Traffic Advisory for CR2 on 4 Jul 2026 (PDF), or refer to the NDP Temporary Restricted Areas advisory (PDF).

In summary, the main impact falls around the National Stadium and Kallang area across the afternoon and evening. A little extra travel planning should help reduce delays, especially for those heading to nearby malls, sports facilities or event venues. πŸ‡ΈπŸ‡¬

Share this with your friends & family members on Facebook!

Advertisement

Be the first to comment

Leave a Reply

Your email address will not be published.




You are currently on the non-secure http website. To access the secure https website, click here.