Marina Bay Singapore Countdown 2025 road closures from 31 Dec 2024 – 1 Jan 2025

Featured image
COMING SOON
Starts31 Dec 2024 (Tue)Ends1 Jan 2025 (Wed)
Location Not Specified
We are now on WhatsApp Channel. Click to join

Due to closure of certain roads and lanes around Marina Bay on New Year’s Eve, the public is encouraged to make their way to Marina Bay Singapore Countdown 2025 via the island-wide Mass Rapid Transit (MRT) system.

Train services will be extended on 31 December 2024. You may check the SMRT and SBS Transit websites for the latest changes in operating hours.

All MRT lines (East-West Line, North-South Line, Downtown Line, Circle Line and Thomson-East Coast Line) have stops in the Marina Bay area. The nearest stations are:

  • Marina Bay (NS27/TE20/CE2)
  • Raffles Place (NS26/EW14)
  • City Hall (NS25/EW13)
  • Shenton Way (TE19)
  • Downtown (DT17)
  • Bayfront (DT16/CE1)
  • Promenade (DT15/CC4)
  • Esplanade (CC3)
  • Gardens by The Bay (TE22)

Overview of Road Closures on New Year’s Eve

Closure TimeRoad NameClosure Extent
6.00pm to 02.00amBayfront Ave towards Temasek AveCarriageway closure
Bayfront Ave towards Marina Blvd
Fullerton Rd (U-turn Point at Water Boat House)Road closure
Esplanade Dr (Nicoll Highway towards Collyer Quay)Carriageway closure
6.00pm to 10.00amEsplanade Dr (Collyer Quay to Nicoll Highway)Rightmost lane
10.00am to 02.00amCarriageway closure
6.00pm to 9.00pmCollyer Quay towards Shenton WayLeftmost lane
9.00pm to 02.00amCarriageway closure
9.00pm to 10.00pmCollyer Quay towards Fullerton RdRightmost lane
10.00pm to 02.00amCarriageway closure
Collyer Quay towards Fullerton Rd
Marina Blvd
Raffles Ave
Temasek Ave towards Bayfront Ave
Bayfront Link
Part of Battery Rd (up to Fullerton Square)
Marina WayRightmost lane
Part of Bayfront Ave towards Temasek Ave (between Marina Blvd
and Bayfront Link)
Leftmost lane
11.00pm to 11.30pmPart of Nicoll Highway (both Carriageways between One Raffles
Link and War Memorial)
Carriageway closure
Republic Blvd towards Raffles Ave
Slip road at Junction of Raffles Blvd / Republic Blvd / Raffles Ave
Temasek Ave towards Temasek Blvd
Slip road from Raffles Blvd into Temasek Ave
Finlayson Green towards Marina BlvdLeftmost lane
11.30pm to 02.00amSheares Link towards Bayfront AveCarriageway closure
11.30pm to 12.15amPart of East Coast Park (Benjamin Sheares Bridge) towards
Sheares Ave and Central Blvd
11.30pm to 12.15amJunction of Republic Blvd and Ophir FlyoverRight lane closure

Click on image to enlarge

For detailed road closure maps, click here (PDF).

For latest updates, click here.

(Header image credits Urban Redevelopment Authority)

Share this with your friends & loved ones on Facebook!

Advertisement

Be the first to comment

Leave a Reply

Your email address will not be published.