
![]()
Sorry, the deal has ended
Don't miss out again, get the latest news via
![]()
| Starts | 31 Dec 2018 (Mon) | Ends | 1 Jan 2019 (Tue) |
|---|---|---|---|
| Location | Not Specified |
We are now on Telegram. Click to join |
Please refer below for the list of affected roads and road closure map for Marina Bay Singapore Countdown 2018
Marina Bay Singapore Countdown 2019
- Date : 31 December 2018 to 1 January 2019
- Organizer: Urban Redevelopment Authority (URA)
- Hotline: 8408 2724
List of affected roads and road closure map
| Time | Road Name | Closure Extent |
|---|---|---|
| 4pm to 5am | Connaught Drive | Full carriageway closure |
| Fullerton Road (towards Collyer Quay) | ||
| Fullerton Road (towards Connaught Drive) | ||
| Saint Andrew’s Road | ||
| 6pm to 2am | Bayfront Avenue (towards Marina Boulevard) | |
| 6pm to 5am | Bayfront Avenue (towards Temasek Avenue) | |
| 6pm to 11pm, 2am to 2.30am | Collyer Quay (towards Shenton Way) | Left lane closure |
| Raffles Avenue | ||
| 9pm to 11pm, 2am to 2.30am | Marina Boulevard | |
| 11pm to 2am | Battery Road | Full carriageway closure |
| Bonham Street | ||
| Collyer Quay (towards Fullerton Road) | ||
| Collyer Quay (towards Shenton Way) | ||
| D’Amelda Street | ||
| De Souza Street | ||
| Flint Street | ||
| Fullerton Square | ||
| Malacca Street | ||
| Marina Boulevard | ||
| Raffles Avenue | ||
| Raffles Link | ||
| Republic Boulevard (towards Raffles Avenue) | ||
| Slip-road at Junction of Raffles Boulevard /Republic Boulevard/Raffles Avenue | ||
| Esplanade Drive | Full carriageway closure (both carriageway) | |
| Temasek Avenue | Full carriageway closure (both directions) | |
| Finlayson Green (towards Marina Boulevard) | Left lane closure | |
| Marina Way |


We are now on Telegram. Click to join
Leave a Reply